Item |
Standard |
Viscosity (Stormer viscometer), Ku |
all colors, paint film formation |
Reference dosage |
50 |
Drying time (25 ℃), H |
surface dry≤1h, hard dry≤24h, Fully cured 7d |
Flashing Point, ℃ |
29 |
Solid Content |
≥50 |
1.Weigh A and B glue according to the given weight ratio into the prepared cleaned container, fully mixed the mixture again the container wall by clockwise, place it along for 3 to 5 minutes, and then it can be used.
2.Take the glue according to the usable time and dosage of mixture to avoid wasting. When the temperature is below 15 ℃, please heat A glue to 30 ℃ first and then mix it to the B glue (A glue will be thicken in low temperature ); The glue must be sealed lid after use to avoid rejection caused by moisture absorption.
3.When the relative humidity is higher than 85%, the surface of the cured mixture will absorb moisture in the air, and form a layer of white mist in the surface, so when the relative humidity is higher than 85%, is not suitable for room temperature curing, suggest to use the heat curing.
The temperature of the base floor is not less than 5℃, and at least 3℃ than the air dew point temperature, the relative humidity must less than 85% (should be measured near the base material), fog, rain, snow, wind and rain is strictly prohibited construction.
Recoating time
Ambient temperature, ℃ |
5 |
25 |
40 |
Shortest Time, h |
32 |
18 |
6 |
Longest time, day |
7 Days |