Sometimes the customer complaint the floor paint is not durable, it is broken after using a few months, large shedding, bumpy. But what has happened?
Firstly, floor paint is attached to the foundation of the ground, and its ultimate bearing surface as the foundation of the ground, so the ground is good or bad will directly affect the service life of floor paint.
Secondly, most of the short-term damage is a cheap floor paint products, and choose the cheapest methods for construction. But the price directly point to the goods, therefore in principle of low price products will appear shortly after being used in epoxy floor coatings appeared blistering shell and large shedding, bumpy.
Then, it is also very important to the life of floor paint is the adhesion between floor paint and floor base.
1, the quality of the material
Epoxy floor paint has a direct impact on the quality of floor construction. Some poor floor paint prices are often very cheap, but there are many problems on self leveling, hardness and wear resistance. The layman can not judge the quality of the floor paint, the cheap one will tend to lose.
2, the skill of construction
Most customer will just ask the total cost for the floor paint, but this is not a simple question. This is a project not just a production. Floor paint construction price is affected by the surface quality factors. Surface roughness, hardness, dryness, whether there is oil, hollowing will affect the construction cost, We tend to see the construction site, to know the construction of the base surface of floor paint what problems need to be addressed, how serious the problem is and how much it is cost. After these works can list the price.
3, clean the surface of base floor
Floor paint is an oily coating, cannot with water, oil and material compatibility, if we no deal with clean oil stain on the ground surface, underground moisture did not fully isolated, epoxy floor is very prone to blistering off. The surface processing, is a major factor affecting the price of floor paint construction, and also is the foundation of the quality of the project. And a lot of adverse party is to omit a lot of basal process, cost reduction, finally gave a deceive consumers “low price”, but the poor quality.
Post time: Apr-12-2023