Item | Datas |
Color | Transparent |
Mixture rate | 2:1:0.3 |
Spraying coating | 2-3 layers,40-60um |
Interval of time(20°) | 5-10 minutes |
Drying time | Surface dry 45 minutes, polished 15 hours. |
Available time (20°) | 2-4 hours |
Spraying and applying tool | Geocentric spray gun(upper bottle) 1.2-1.5mm;3-5kg/cm² |
Suction spray gun(lower bottle) 1.4-1.7mm; 3-5kg/cm² | |
Theory quantity of paint | 2-3 layers about 3-5㎡/L |
Storage life | Store for more than two years keep in original container. |
. Enables efficient rapid repairs
. Reduces paint defects
. Flexibility of drying equipment
. Efficient material usage
1, It applies to thoroughly ground and cleaned intermediate paints, original paint or intact 2K paint surface. And soft based materials with an insulating layer.
2, It can be used for partial spraying of new cars or repairing of old cars.
Old paint film that has been hardened and polished, the surface should be dry and free of impurities such as grease.
1.Spray as far as possible, special cases can be brush coating;
2.The paint must be evenly mixed during construction,and the paint should be diluted with a special solvent to the viscosity required for construction.
3.During construction,the surface should be dry and cleaned of dust.
4.Spray 2-3 layers, can be polishing after 15 hours.
1.Base temperature is not less than 5°C,the relative humidity of 85% (temperature and relative humidity should be measured near the base material),fog, rain , snow, wind and rain is strictly prohibited construction.
2.Before painting the paint, clean the coated surface to avoid impurities and oil.
3.The product can be sprayed, it is recommended to spray with special equipment. The nozzle diameter is 1.2-1.5mm,the film thickness is 40-60um.